Notes & Addenda to Bid Documents

Housing Authority of Southeastern Utah
Arroyo Crossing Project

Please deliver sealed bids to the Housing Authority office at 321 E Center St. Moab, UT. Bids are due by 3pm, October 3rd, 2022. Phase 2 at Arroyo Crossing will be 10 homes with 3 different potential floor plans. Please provide a price/bid for each house plan in
one sealed bid.

Framing Bidders:

  • Please include an option for open soffits with a framing bid: no roof sheathing over eaves, finish material used for fascia, HASU to apply soffit material.

  • Include framing rough sawn porches and pergolas.

Plumbing Bidders:

  • Note that the culinary waterline must be run in a separate trench up the side yard to allow space for gray water basins in the front yard.

  • Water heaters should include service valves.

Concrete Bidders:

  • Concrete may need to be poured in December or January.

  • Include provisions for cold-weather foundation pours.